Summers Superchisel - 5-Section Manuel d'utilisateur Page 50

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 98
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 49
3-6
SECTION 3 – CHISEL PLOW OPERATION
FIELD OPERATION
1. Always rephase cylinders before starting eld operation.
2. Choose a at spot in a eld to set depth and level the chisel plow.
3. Determine desired tillage depth by working test strips within the eld.
IMPORTANT!
The operator is responsible for adjusting the machine since machine does not come “Field
Ready” from the factory.
NOTE: Optimum performance of the machine is achieved by tilling at a depth and moving at
a speed that does not go beyond the limit of the trip assemblies. This limit is exceeded if the
connecting bolt (shown in the following drawing) continually rides above the trip assembly
cap.
Vue de la page 49
1 2 ... 45 46 47 48 49 50 51 52 53 54 55 ... 97 98

Commentaires sur ces manuels

Pas de commentaire