Operator’sManualSUPERCHISELSUMMERS MANUFACTURING CO., INC.WEB SITE: www.summersmfg.comMADDOCK, NORTH DAKOTA 58348 ...
WARNINGTO AVOID INJURY INSTALL CYLINDER LOCKS BEFORE TRANSPORTING OR SERVICING MACHINE.8Z0342TO AVOID INJURY OR DEATH STAND CLEAR OF MACHINE WHEN WING
SECTION 6 – PARTS (16’-44’)6-16
SECTION 6 – PARTS (16’-44’)6-17 11/6/2012 Trip Assembly.iam/8K55158T33008X02828X03168T51508X03068X02608X02608X03068X01188T05048T68108X0115B8T50508X026
1. Attach hitch frame to rear of chisel plow. – Use 3/4 x 2” bolts.2. Slide rear hitch slide into place.3. Insert spring load pin. – Spring and wash
SECTION 6 – PARTS (16’-44’)6-19HUB AND AXLE COMPONENTSAssembly Notes:A. Tighten axle nut to 45 ft.-lbs, loosen nut until rst slot is aligned with hol
SECTION 6 – PARTS (16’-44’)6-20
SECTION 6 – PARTS (16’-44’ : OPTIONAL)6-211. 52” mounting arms (PN 8H2314) should be used when attaching Summers mounted harrows.2. Mounting arm locat
SECTION 6 – PARTS (16’-44’ : OPTIONAL)6-22
SECTION 6 – PARTS (16’-44’ : OPTIONAL)6-23MTD HRRW LAYOUT12/2/2010 9T1612H.iam/0"31"55"31"55"8HD5098EXT8HD5098EXT8' SECT
SECTION 6 – PARTS (16’-44’ : OPTIONAL)6-24MTD HRRW LAYOUT12/2/2010 9T2012H.iam/0"32"88"32"88"8HD5098EXT8HD5098EXT10' SEC
SECTION 6 – PARTS (16’-44’ : OPTIONAL)6-25MTD HRRW LAYOUT12/1/2010 9T2412N.iam/0"31"54 1/4"103"126 1/4" 31" 54 1/4"
SECTION 1 - SAFETY1-5 9. PN 8Z0348 – DECAL FOR GAUGE WHEEL DEPTH 10. PN 8Z0800 – AMBER REFLECTOR 11. PN 8Z0805 – RED-ORANGE REFLECTOR 12. PN 8Z0810 –
SECTION 6 – PARTS (16’-44’ : OPTIONAL)6-26MTD HRRW LAYOUT3/17/20149T2612N.iam/26' MOUNTED HARROW LAYOUT0"31"54 1/4"103"126 1/
SECTION 6 – PARTS (16’-44’ : OPTIONAL)6-27MTD HRRW LAYOUT12/2/2010 9T2812N.iam/0"31 1/16"54 5/16"126 5/16"135 5/16" 30 15/16&
SECTION 6 – PARTS (16’-44’ : OPTIONAL)6-28MTD HRRW LAYOUT9/28/20119T3012N.iam/30' NRRW MOUNTEDHARROW LAYOUT0"31"54 1/4"126 1/4&quo
SECTION 6 – PARTS (16’-44’ : OPTIONAL)6-29
SECTION 6 – PARTS (16’-44’ : OPTIONAL)6-30
SECTION 6 – PARTS (16’-44’ : OPTIONAL)6-31
6-32SECTION 6 – PARTS (FRONT CASTER OPTION)Installation Instructions forFront Caster Option
SECTION 6 – PARTS (FRONT CASTER OPTION)6-33HITCH REMOVAL3/19/20149T6012.iam/8CC4000 8X02347/16" LNUT8X00447/16" X 3-1/2"8K1640 8X0355RE
SECTION 6 – PARTS (FRONT CASTER OPTION)6-34WHEEL REMOVAL3/20/20149T6012.iam/8K7042 8K1105S 8X00721/2" X 3-3/4"8X0242NY-LOCK 1/2" NREMOV
SECTION 6 – PARTS (FRONT CASTER OPTION)6-35HTCH TOWR ASSY5/22/20129T6012.iam/8X01551.5" X 9"8X03151-1/2" LW8X02851 1/2" N8T3950
SECTION 1 - SAFETY1-6
SECTION 6 – PARTS (FRONT CASTER OPTION)6-36DETAIL ASCALE 1 / 10HTCH TWR BRACE ASSY5/22/20129T6012.iam/A8X01307/8" X 2"8X03077/8" LW8T3
SECTION 6 – PARTS (FRONT CASTER OPTION)6-37LINK ARMS-BEAM ASSY5/22/20129T6012.iam/8X02347/16" LNUT8X00447/16" X 3-1/2"8T3620 8CC6022 8C
SECTION 6 – PARTS (FRONT CASTER OPTION)6-38CASTR ASSY3/20/20149T6012.iam/8K1105S8X0242NY-LOCK 1/2" N8X00721/2" X 3-3/4"8X02613/4"
SECTION 6 – PARTS (FRONT CASTER OPTION)6-39CYL ATTACH5/22/20129T6012.iam/8K9106 8X02851 1/2" N8X03183/4" FW8X03063/4" LW8X01113/4"
SECTION 6 – PARTS (FRONT CASTER OPTION)6-40DETAIL ASCALE 1 / 10SNGL POINT DEPTH CNTRL5/22/20129T6012.iam/A7CC03858X0328H7CC03858X03161" FW8X0282
SECTION 6 – PARTS (FRONT CASTER OPTION)6-41HITCH INSTALL3/17/20149T6012.iam/8K1640 8X02347/16" LNUT8X00447/16" X 3-1/2"8X03558CC4000
SECTION 6 – PARTS (FRONT CASTER OPTION)6-42BOLT PLATE WELDING4/26/20129T6012.iam/SEE NOTENOTE:WELD BOTTOM OF BOLT PLATE TO TUBE AS SHOWN.BEAD SIZE = 3
SECTION 6 – PARTS (FRONT CASTER OPTION)6-43CHSL CASTR DEPTH CNTRL HYD6/12/20138J55203/4" ORB X #10 STR8J60203/4"-16ORB X 10 JIC(M) 90° ADP8T
SECTION 6 – PARTS (FRONT CASTER OPTION)6-44CHSL CASTR DEPTH CNTRL HYD6/12/20138N63543/4 X 354"8N41981/2 X 198"+8J5110 UNION+8N41981/2 X 198&
6-45SECTION 6 – PARTS8A1155 U-BOLT 3/8 X 6-1/16 X 5” SQ8A1156 U-BOLT 3/8 X 4-1/16 X 5” SQ8A1157 U-BOLT 3/8 X 4-1/16 X 7” SQ8A4048 NYLON TIE .18 X
SECTION 2 – ASSEMBLY INTRODUCTIONGENERAL ASSEMBLY SAFETY PRACTICES1. READ AND UNDERSTAND Operator’s Manual before assembly of machine.2. Machine shoul
6-46SECTION 6 – PARTS8HD5086Q 3RDPIP/LVR10’ 3BR104/6 QADJ00-8HD5087 3RD PIPEW/LVR10’ 104/6 4BR 98-8HD5088Q 4THPIP/LVR10’ 4BR104/6 QADJ02-8HD5094 E
6-47SECTION 6 – PARTS8K8030A MODULE AG ENHNCDW/BRAKE6PIN08-8K8060B EXT HRNSS 12’6PIN DEUTSCH09-8K8067 DUST CAP FOR 7PIN CONNECT00-8K8070B MAIN HRN
6-48SECTION 6 – PARTS8S0295 U-BOLT 3/8 X 2-5/8 X 4-1/4”RND8S0315 U-BOLT 3/8 X 3 X 4-1/8” RND8S0317 U-BOLT 3/8 X 3.63 X 5.88” RND8S0319 U-BOLT 3/8
6-49SECTION 6 – PARTS8T4176 SUPPORT-WHL SPRG LARM LEFT99-8T4177 SUPPORT-WHL SPRG LARM RGHT99-8T4178 FRONT-SPRG I-BLT ATTCH LEFT99-8T4179 FRONT-SPR
6-50SECTION 6 – PARTS8X0083 BOLT 1/2-13NC X 8” GR5 YZ8X0084 BOLT 1/2-13NC X 9” GR5 YZ8X0087 BOLT 5/8-11NC X 1-1/2” GR5 YZ8X0090 BOLT 5/8-11NC X 2-
SECTION 6 – PARTSStock DescriptioncodeStock Descriptioncode6-518X0316 WASHER 1” SAE FLAT YZ8X0317 WASHER 3/4” SAE FLAT YZ8X0318 WASHER 3/4”(13/16”I
SECTION 6 – PARTS6-52NOTES
History of Summers Manufacturing Co., Inc.1965 – Summers Manufacturing is founded by Harley Summers, who purchases patent rights for Goebel truck and
TillageLand Rollers/Packers SprayersCultivators/HarrowsRock PickerMounted Attachments 1-800-732-4347•www.summersmfg.com
2-2SECTION 2 – ASSEMBLY INTRODUCTIONGENERAL SAFETY PRACTICESYOU ARE RESPONSIBLE for the safe assembly of the machine.DO NOT ALLOW CHILDREN or other u
SECTION 2 – SET-UP OF CENTER SECTION (16’-20’)1. Place front and rear center section on oor with bolt plates facing each other.2. ATTACH sections wit
SECTION 2 – SET-UP OF CENTER SECTION (16’-20’)2-4CENTER W-CYL.ATTCH3/19/20149T2012H/8CC40008X02347/16" LNUT8X00447/16" X 3-1/2"8K1640 8
2-5SECTION 2 – SET-UP OF CENTER SECTION (16’-20’)3. Block center frames off the oor.4. Install cylinder attach brackets with 3/4” u-bolts. NOTE: –
2-6SECTION 2 – SET-UP OF CENTER SECTION (16’)SHANK-GANGS11/30/2010 9T1612H.iam/16' CHISEL PLOWL -- R - SUGGESTED TWISTED SPIKE LAYOUTLLRRRRLRRLLR
SECTION 2 – SET-UP OF CENTER SECTION (20’)2-7SHANK-GANGS11/30/20109T2012H.iam/L -- R - SUGGESTED TWISTED SPIKE LAYOUT20' CHISEL PLOWLLRRLRLRLRLLR
WarrantySummers warrants only products of its manufacture against operational failure caused by defective materials or workmanship which occur during
SECTION 2 – SET-UP OF CENTER SECTION (24’-30’ NARROW)2-81. Place front and rear center section on oor with bolt plates facing each other.2. ATTACH se
SECTION 2 – SET-UP OF CENTER SECTION (24’-30’ NARROW)2-94. Install cylinder attach brackets with 3/4” u-bolts. NOTE: – Locate Rear Cylinder Attach
2-10SECTION 2 – SET-UP OF CENTER SECTION (24’-30’ NARROW)NOTE: Drawing for steps 6 through 10 is on next page.6. All liftarms will be centered benea
2-11SECTION 2 – SET-UP OF CENTER SECTION (24’-30’ NARROW)DETAIL ADETAIL BCENTER W-TRANSPORT2/9/2012 9T2412N.iam/AB8K70338K11008X0242NY-LOCK 1/2"
2-12SECTION 2 – SET-UP OF CENTER SECTION (24’-30’ NARROW)14. Attach hitch to center with 8K1640. NOTE: Center with 1-1/2” ID 10 GA at washers.15. In
2-13SECTION 2 – SET-UP OF WINGS (24’-30’NARROW)NOTE: It is recommended to set up both sides of machine at the same time. The left hand side is shown.1
2-14SECTION 2 – SET-UP OF WINGS (24’-30’NARROW)DETAIL ADETAIL BABWING-TRANSPORT2/21/2013 9T2412N.iam/8X00741/2" X 4-1/2"8X0242NY-LOCK 1/2&
4. Center liftarm under cylinder attach brackets. – Use 3/4” u-bolts for 4x4 to attach liftarm pivots (8T4100) to frame. – Slide pivot pin (8T3640)
2-16SECTION 2 – SET-UP OF WINGS (24’-30’NARROW)WING-EXT12/2/2010 9T2812N.iam/28' ONLY26'-28' ONLY8CC4075 8T4060 8X02603/4" N8X0306
2-17SECTION 2 – SET-UP OF WINGS (24’-30’NARROW)30' NRRW WNG EXT2/14/20129T3012N.iam/8T40758X02603/4" N8X03063/4" LW8X01123/4X2-1/4"
INTRODUCTIONThis manual provides the following information about your Summers Chisel Plow.SECTION CONTENTS Section 1 – SAFETY explains important safe
2-18SECTION 2 – SET-UP (24’-30’NARROW)24' CHSL SHANKS-GANGS12/1/2010 9T2412N.iam/0"6"18"30"42"54"66"78"90
2-19SECTION 2 – SET-UP (24’-30’ NARROW)26' CHSL SHANK LAYOUT12/2/2010 9T2612N.iam/0"6"18"30"42"54"66"78"9
2-20SECTION 2 – SET-UP (24’-30’ NARROW)28' CHSL SHANK LAYOUT12/2/2010 9T2812N.iam/0"6"18"30"42"54"66"78"9
2-21SECTION 2 – SET-UP (24’-30’NARROW)30' NRW CHSL SHANK LAYOUT2/3/2012 9T3012N.iam/30' NARROW CHISEL PLOW0"6"18"30"42&q
2-22SECTION 2 – SET-UP (24’-30’NARROW)11. Install shanks into trip assemblies. – Install rear 3/4 x 4” bolt. Slide shank into shank holder. Install f
SECTION 2 – SET-UP OF CENTER SECTION (32’-44’)1. Place front and rear center section on oor with bolt plates facing each other.2. ATTACH sections wit
SECTION 2 – SET-UP OF CENTER SECTION (32’-44’)3. Block center frames off the oor.4. Install cylinder attach brackets with 3/4” u-bolts. NOTE: – Lo
2-25SECTION 2 – SET-UP OF CENTER SECTION (32’-44’)NOTE: Drawing for steps 6 through 10 is on the next page.6. All liftarms will be centered beneath cy
2-26SECTION 2 – SET-UP OF CENTER SECTION (32’-44’)11. Attach wing transport locks to center frame with 3/4” u-bolts. – Located outside edge of bolt p
2-27SECTION 2 – SET-UP OF CENTER SECTION (32’-44’)14. Attach hitch to center with 1-1/2” x 10-5/8” pins. NOTE: Center with 1-1/2” ID 10 GA at washer
TABLE OF CONTENTSSECTION 1 – SAFETY Safety-Alert Symbol ...
2-28SECTION 2 – SET-UP OF 32’ BASE MACHINES (32’-38’)
2-29SECTION 2 – SET-UP OF 32’ BASE MACHINES (32’-38’)NOTE: It is recommended to set up both sides of machine at the same time. The left hand side is s
2-30SECTION 2 – SET-UP OF 32’ BASE MACHINES (32’-38’)
2-31SECTION 2 – SET-UP OF 32’ BASE MACHINES (32’-38’)9. Install optional wing extensions. – One-shank extension must be placed on rear rank. – Two-s
2-32SECTION 2 – SET-UP OF 32’ BASE MACHINES (32’-38’)16. Check free operation of gauge wheel assembly. – Loosen or tighten slotted nut for optimum pe
SECTION 2 – SET-UP OF 32’ BASE MACHINES 700# TRIP (32’-38’ SHOWN)2-33
SECTION 2 – SET-UP OF 32’ BASE MACHINES 1050# TRIP (32’-36’ SHOWN)2-34
2-35SECTION 2 – SET-UP OF 32’ BASE MACHINES (32’-38’)21. Install shanks into trip assemblies. – Install rear 3/4 x 4” bolt. Slide shank into shank ho
2-36SECTION 2 – SET-UP OF 40’ BASE MACHINES (40’-44’)
2-37SECTION 2 – SET-UP OF 40’ BASE MACHINES (40’-44’)NOTE: It is recommended to set up both sides of machine at the same time. The left hand side is s
SECTION 5 – TROUBLESHOOTING AND SPECIFICATIONS ... 5-1 Width, Height, Weight
2-38SECTION 2 – SET-UP OF 40’ BASE MACHINES (40’-44’)
2-39SECTION 2 – SET-UP OF 40’ BASE MACHINES (40’-44’)10. Install optional wing extensions. – One-shank extension must be placed on rear rank. – Two-
2-40SECTION 2 – SET-UP OF 40’ BASE MACHINES (40’-44’)17. Check free operation of gauge wheel assembly. – Loosen or tighten slotted nut for optimum pe
2-41SECTION 2 – SET-UP OF 40’ BASE MACHINES (40’-44’)
2-42SECTION 2 – SET-UP OF 40’ BASE MACHINES (40’-44’)22. Install shanks into trip assemblies. – Install rear 3/4 x 4” bolt. Slide shank into shank ho
2-43SECTION 2 – HYDRAULIC SET-UP (16’-30’ NARROW)1. Hydraulic hoses and ttings for depth control cylinders can be found on following drawings. – Rep
SECTION 2 – HYDRAULIC SET-UP (16’-30’ NARROW) C. Leave plenty of slack by hitch pivot. – The hitch pivot point will move up and down from transpor
SECTION 2 – HYDRAULIC SET-UP (16’-30’ NARROW)2-45 I. Use nylon ties to hold rst hose to second hose. – This hose must be attached to base end (to
SECTION 2 – HYDRAULIC SET-UP (16’-30’ NARROW)2-46 M. Tighten all plastic hose clamps until hoses are snug but not compressed. Over tightening hose cl
2-47SECTION 2 – HYDRAULIC SET-UP (32’-44’)1. Hydraulic hoses and ttings for depth control cylinders can be found on following drawing. – Rephasing c
2-48SECTION 2 – HYDRAULIC SET-UP (32’-44’)
2-49SECTION 2 – HYDRAULIC SET-UP (32’-44’) I. Route hose from 6 x 10” to 5-1/2 x 10” cylinder along same path as rst hose. – A 216” hose is used
2-50SECTION 2 – HYDRAULIC SET-UP (32’-44’)3. Charge depth control cylinder system. – Connect depth control cylinder hoses to tractor. Insure that ti
2-51SECTION 2 – HYDRAULIC SET-UP (32’-44’)5. Route hoses along frame and hitch the same way depth control cylinder hoses are routed. – Stack hoses on
2-52SECTION 2 – HYDRAULIC SET-UP (32’-44’)6. Charge Wing Lift Cylinders. – Block rod end of cylinders so cylinders can extend without hitting anythin
2-53SECTION 2 – HYDRAULIC SET-UP (32’-44’)8. With cylinder attach eyebolts loose, raise chisel plow wings to transport position. – Fully retract cyli
2-54SECTION 2 – DECALS/OPTIONS1. Install danger, warning, and caution decals. – Part numbers can be found on lower right hand corner of each decal. M
3-1SECTION 3 – CHISEL PLOW OPERATIONCHISEL PLOW OPERATION SAFETY 1. READ AND UNDERSTAND Operator’s Manual before using machine. Review at least an-nua
3-2SECTION 3 – CHISEL PLOW OPERATIONINITIAL HOOKUP 1. Make tractor to hitch connection with locking draw pin and safety chain. 2. Retract jack and r
3-3SECTION 3 – CHISEL PLOW OPERATION7. Lower wings with caution. Do not raise or lower the wings when moving. Operate tractor hydraulics from operato
SECTION 1 - SAFETY SAFETY-ALERT SYMBOL This symbol is used to denote possible danger and care should be taken to prevent bodily injury. This s
3-4SECTION 3 – CHISEL PLOW OPERATION8. Fully extend depth control cylinders and maintain hydraulic pressure for 30 seconds to insure that all air has
3-5SECTION 3 – CHISEL PLOW OPERATION9. (Continued) – Store transport locks on holders.10. Become familiar with single point depth control. Control can
3-6SECTION 3 – CHISEL PLOW OPERATIONFIELD OPERATION 1. Rephase cylinders before starting eld operation. 2. Choose a at spot in a eld to set tilla
SECTION 3 – CHISEL PLOW OPERATION3. (Continued) – Trip Assembly Limit3-74. After determining desired tillage depth, set depth control plunger accordin
3-8SECTION 3 – CHISEL PLOW OPERATION5. Leveling chisel plow from side to side. Stop tractor with machine in the ground. Check depth of tillage on th
3-9SECTION 3 – CHISEL PLOW OPERATION6. Leveling machine from front to back. 16’ - 30’ Narrow: With chisel plow still in the ground, check depth of
3-10SECTION 3 – CHISEL PLOW OPERATION7. Setting gauge wheels (32’ Standard-44’). After depth has been established and chisel plow has been leveled, o
SECTION 3 – CHISEL PLOW OPERATION8. Operation “Tips” – The 5 solid lift arms on this machine are designed to prevent skewing from side to side. To av
3-12SECTION 3 – CHISEL PLOW OPERATION4. Use a safety chain between tractor drawbar and chisel plow hitch when transporting.5. Only tow at a safe speed
4-1SECTION 4 – MAINTENANCEMAINTENANCE SAFETY1. STOP engine, place all controls in neutral, set parking brake, remove ignition key and wait for all mov
WARNINGREMOVE TRANSPORT LOCK(S) BEFORE LOWERING MACHINE.IF LOCK(S) DO NOT REMOVE FREELY, INSURE THATCYLINDERS ARE COMPLETELY FILLED WITH HYDRAULICFLUI
4-2SECTION 4 – MAINTENANCEDAILY MAINTENANCE1. Grease lift arms, walking tandem assemblies, and hitch pivot.2. Check all hydraulic components for leaks
5-1SECTION 5 – TROUBLESHOOTINGPROBLEM CAUSE CORRECTION1. Not tilling level. A. Depth control cylinders out of phase.Rephase cylinders. See page 3-6.B.
5-2SECTION 5 – TROUBLESHOOTINGWIDTH, HEIGHT, WEIGHT, LENGTHTIRE SPECIFICATIONS APPROX. APPROX WEIGHT WEIGHT LENGTH SIZE TRANSPORT TRANSPORT
BOLT SIZE WRENCH SIZE GRADE 5 GRADE 8ft-lbs N • m ft-lbs N • m1/4” 7/16” or 3/8” 7 9.5 12 175/16” 1/2” 15 20 25 343/8” 9/16” 30 41 45 617/16” 5/8” or
SECTION 5 – TROUBLESHOOTING5-4NOTES
6-1SECTION 6 – PARTSBRING YOUR OWNER REGISTER INFORMATION LOCATED AT THE BEGINNING OF THIS MANUAL WHEN ORDERING PARTS (SERIAL NUMBER IS LOCATED BY THE
6-2SECTION 6 – PARTSCENTER2/15/2011 9T2012H.iam/8CC5018 8X01123/4X2-1/4"8X03063/4" LW8X02603/4" N8T4030 - 16' REAR8CC4028 - 20&apo
6-3SECTION 6 – PARTS16’ & 20’CENTER W-CYL.ATTCH3/19/20149T2012H/8CC40008X02347/16" LNUT8X00447/16" X 3-1/2"8K1640 8T42248X02851 1/2
6-4SECTION 6 – PARTSCENTERS2/16/20119T2412N.iam/8X02603/4" N8X03063/4" LW8X01123/4X2-1/4"8CC50708CC50628T40108X02603/4" N8X03063/4
6-5SECTION 6 – PARTSCENTER W-CYL.ATTCH3/19/20149T2412N.iam/q8X02851 1/2" N8T422424', 26', 28' & 30' NARROW CYLINDER ATTAC
CAUTION1. Read and understand Operator’s Manual before using machine.2. For Sprayers: a. Read and follow chemical manufacturers’ WARNINGS,
6-6SECTION 6 – PARTSDETAIL ADETAIL BCENTER W-TRANSPORT2/9/2012 9T2412N.iam/AB8K70338K11008X0242NY-LOCK 1/2" N8X02033/8" FN8A11563/8 X 4-1/
6-7SECTION 6 – PARTSWING3/19/20149T2412N.iam/8T3600 8X02347/16" LNUT8C6015 8X00447/16" X 3-1/2"8X02851 1/2" Nq8T4224 24', 26&
6-8SECTION 6 – PARTSDETAIL ADETAIL BABWING-TRANSPORT2/21/2013 9T2412N.iam/8X00741/2" X 4-1/2"8X0242NY-LOCK 1/2" N8S0660 8T4174 8X0077
6-9SECTION 6 – PARTS SECTION 6 – PARTS
6-10SECTION 6 – PARTS (32’-38’) SECTION 6 – PARTS (32’-38’)
6-11SECTION 6 – PARTS (40’-44’)
SECTION 6 – PARTS (16’-30’ NARROW)6-12DISKCHSL-CLTRCHSL/DEPCONHYD4/8/20108T10606.0" X 10"8J55203/4"-16ORB X 10 JIC(M)8J55203/4"-16
6-13SECTION 6 – PARTS (24’-30’ NARROW)DISKCHSL-CLTRCHSL/DEPCONHYD4/8/20108T10606.0" X 10"8J55203/4"-16ORB X 10 JIC(M)8J55203/4"-16
6-14SECTION 6 – PARTS (32’-44’ NARROW)
SECTION 6 – PARTS (32’-44’)6-15
Commentaires sur ces manuels